United Electronics Co. were the suppliers of Mitsubishi Electric CITY MULTI (VRF) System with ventilation for the BAIT AL OUD Music Academy Building in ABU DHABI.
United Electronics carried out the design, circuiting and selection of indoor units (Ducted and Cassette Type). Total Cooling Capacity was 16.5TR. The system was commissioned in October 2017 and is operating perfectly.
The BAIT AL OUD Building was developed by: M/S Abu Dhabi Tourism Authority and M/S Musanada
The Main Contractor was M/S Al Reyami Group